Monthly Archives: Saturday July 2nd, 2011

Work, wiring, landscape and tests

Some news about my layout. I have worked on several subjects. Ballast tests : Tortoise motor and turnouts wiring. The second curve is ready, I have still to set the Peco’s bretelle double, and the track 3 and 4. I have worked on the platform ; some passengers wait the train (the time can be long !).

Posted in Rail layout | Tagged , , , , | 6 Comments